Union Bluff

This project includes various energy efficiency technologies. The HVAC system consists of air to water (inverter driven) heat pumps to provide both heating and cooling to the building. The distribution systems consist of hydronic radiant floors and ducted air handlers.  The domestic hot water and supplemental heat were provided by a condensing gas boiler. The system employed air to air …

Ames Chapel

TE2 Engineering was hired as the MEP design engineer for the rehabilitation and revitalization of the historic Ames Chapel, located at the Hingham Cemetery in Hingham, MA. The chapel was originally constructed in 1886, although has served as office space and storage since the 1920’s.  The project included many upgrades such as spray foam insulation, fire protection/fire alarms systems, radiant …